Transmission Line Works

  • Liberia Accelerated Electricity Expansion Project – Upgrade of Paynesville-Kakata Transmission Line to ensure safe operation. Analysis, using PLS-Tower, to increase the utilizable height of the existing towers and analysis of the impact of the upgrade in height on the existing foundations. Provision of an optimum design solution for an upgrade of both the structures and foundations to ensure safe operation of the line. Re-spotting, using PLS-CADD, of 66kV Overhead Transmission Line using a combination of lattice and monopole steel towers to ensure safe operation.– July to December 2018
  • Volta-Achimota Transmission Line Project – 161kV Overhead Transmission Line Design including Tower spotting using PLS-CADD, detailed design of foundations for family of towers and design of special gantry tower with foundations for Sieyuan Electric Company Limited of China. – October 2017 to December 2018
  • Engineering, Design, Procurement Support and Construction Management of a 6km Double Circuit 161kV Overhead Transmission Line Grid Connection to 370MW AKSA Power Plant in Tema, Ghana for AKSA Energy Ghana Limited – Feb 2017 to September 2018.
  • Prestea-Kumasi Power Enhancement Project - Tower spotting of 330kV lattice steel tower power line (185km) and tower foundation designs for GS Engineering and Construction Corporation of Korea – Sept 2015 to July 2017.
  • Power Supply to Export Processing Zone - Tower spotting of 11.5kV lattice steel tower power line (10km), equipment specification and tower foundation designs – Dec 2006
  • Wexford Power Project – Design and Construction of 161kV latticed steel tower power line (50km) – Nov. 2004
  • Sawla Substation Project – Design and Construction 34.5kV latticed steel tower power line (5km) – April 2001
  • Aflao Substation Project – Design and Construction of 34.5Kv latticed steel tower power line (1.8km) – April 2000

 

Substation Works

  • Volta-Achimota Transmission Line Project – Detailed design of control building expansion and substation gantry towers and foundations for Sieyuan Electric Company Limited of China. – October 2017 to date
  • Prestea-Kumasi Power Enhancement Project – Design of substation civil works, equipment foundations and buildings for GS Engineering and Construction Corporation of Korea – Sept 2015 to July 2017
  • Akosombo, Winneba & Kumasi Substations Upgrade Project - Design of Substation Civil Works, Equipment Foundations and Steel Structures – March 2009
  • Relocation of Tarkwa Substation Project (Gold Fields Ghana Ltd.) - Design and Specification of 161kV Power line Diversion Works – April 2007
  • Power Supply to Export Processing Zone - Design of 11.5kV substructure civil works – Dec 2006
  • Ahafo Project - Designed substation civil works, steel structures, electromechanical layout/sections, control, protection and metering schematic diagrams for Sunyani and Kumasi substation works – June 2006
  • Wexford Power Project - Designed substation civil works, electromechanical layout/sections, control, protection and metering schematic diagrams – Nov. 2004
  • Prestea-Oboasi Transmission Line Project – Design of substation civil works, steel structures, electromechanical layout/sections, control, protection and metering schematic diagrams – March 2002 – June 2004
  • Sawla Substation Project – Design of civil works, structures, foundations and buildings – April 1998

 

Power Station Works

  • Tema Thermal 1 Power Project - Structural analysis and design of 4,100m3 raw water tank. – March 2007
  • Structural analysis and design of Plant main buildings including offices, workshops, warehouses and laboratories. – March 2007

Feasibility Studies

  • Pre-Feasibility Study for 15MW Grid - Connected Solar or Wind Power Project in the Republic of Ghana for Cape Tano Oil Limited – Oct. 2011
  • Feasibility Studies “Connection of Ayanfuri Gold Plant to the National Grid (GRIDCo)” for Central Ashanti Gold Limited – June 2009